Projects / Central Ammonia Chiller & Glycol Loop Overhaul
CASE STUDY // HVACCold Chain Logistics Operator18,500 m² cold storage facility

Central Ammonia Chiller & Glycol Loop Overhaul

Ammonia refrigeration compressor package and glycol loop header overhaul
FIELD RECORD // PROCESS HVAC & INDUSTRIAL REFRIGERATION

Engineering Performance Metrics & Delivery Parameters

Cooling Capacity1,700 kW
Temperature Hold-22°C continuous
Radiographic Tests100% pass
Energy Reduction18.4% COP gain
FIGURE 1.0 // AS-BUILT SCHEMATICVerified by Lead Discipline Engineer
FLOWSHEET // INDUSTRIAL AMMONIA & GLYCOL LOOPPID-HVAC-302
COMP-1850 kWEVAP CONDGLYCOL HEAT EXCH-22°C HOLD STABLESUCTION RETURN (R717)

The Technical Brief

Refurbish two 850kW ammonia screw compressor packages, re-pipe suction and discharge headers, and replace the secondary propylene glycol pumping manifold.

Site & Operating Constraints

The facility stores over $14M in perishable seafood and dairy stock. Room temperatures had to remain locked at -22°C continuously throughout hot work and pipe header replacements.

Execution Methodology & Works Delivered

  • Installed a temporary external glycol chiller skid with bypass manifolds to sustain cooling loads
  • Isolated, purged, and chemically swept the existing ammonia circuits under certified refrigeration procedures
  • Fabricated Schedule 40 low-temperature carbon steel headers with 100% radiographic weld inspection
  • Replaced twin oil separators, installed automated variable-frequency drive controls on compressor motors
  • Executed ammonia charge balancing and vacuum hold verification down to 500 microns

Verified Outcome

Total system coefficient of performance (COP) improved by 18.4%, saving approximately $4,200 monthly in electrical demand charges while keeping storage temperatures constant throughout.

Discuss Similar Facility Scope

If your plant requires similar switchgear cutover, refrigeration overhaul, or cleanroom installation, speak directly with our team.

Discuss via WhatsAppSubmit Detailed RFQ

Job Summary

Total Duration6 weeks continuous execution
Downtime AllocationZero process stoppage (continuous phased cutover)